Step 1.
Pre-Construction
Getting to Know You:
We meet our clients at our design office or over the phone. Together we explore your needs and possibilities and answer questions regarding our property, project and our process.
Design Phase:
-
Site and Feasibility Analysis
-
Site Conditions
-
Schematic Design
-
Construction Drawings
-
Structural Engineering Plans
-
Cost Estimation
-
Project Coordination
-
Permitting
Step 2.
Manufacturing / Site Prep
Beginning the construction phase:
​
Factory construction offers many opportunities for increased efficiency and economies of scale. The production process which is optimized in a centralized and controlled environment, allows for speed of construction and decreased waste.
Speed of construction is also achieved due to site work being done concurrently to manufacturing.
In Factory:
Depending on state, local codes, and client preferences we are able to provide a 50-90% factory built home
60% includes:
-
Cuts / Openings
-
Structural Reinforcements
-
Windows / Doors
-
Framing of Exterior / Interior Walls
-
Spray Foam Insulation
-
Electrical-Plumbing-Mechanical (this depends on the municipality)
Sitework:
-
Grading
-
Utilities
-
Foundation
-
Hardscape and Landscape
Step 3.
Delivery / Installation
Delivery:
-
Flat-Bed / Step-Deck Trucks from Factory to Site
​
Installation:​
- Craned into Property
- Installed onto Foundation
-
Welded/Bolted Together
-
Utilities are Connected
Step 4.
On - Site Finishes
Finishing Touches:​
This is where each project is personalized to reflect the client's individual taste and preferences.
Exterior Finishes:
-
Siding
-
Roofing
-
Solar Panels
-
Exterior Lighting
​
Interior Finishes:
All that was not done in factory:​
-
Drywall / Paint
-
Flooring
-
Lighting
-
Bathroom / Kitchen Installation