Step 1.

Pre-Construction

MEPs and Elevations V3.jpg

Getting to Know You:

 

We meet our clients at our design office or over the phone. Together we  explore your needs and possibilities and answer questions regarding our property, project and our process. 

Design Phase:

 

  • Site and Feasibility Analysis

  • Site Conditions

  • Schematic Design

  • Construction Drawings

  • Structural Engineering Plans

  • Cost Estimation

  • Project Coordination

  • Permitting

Step 2.

Manufacturing / Site Prep

AdobeStock_180177203.jpeg

Beginning the construction phase:

​

Factory construction offers many opportunities for increased efficiency and economies of scale. The production process which is optimized in a centralized and controlled environment, allows for speed of construction and decreased waste.

Speed of construction is also achieved due to site work being done concurrently to manufacturing.

In Factory:

Depending on state, local codes, and client preferences we are able to provide a 50-90% factory built home

 

60% includes:

  • Cuts / Openings 

  • Structural Reinforcements

  • Windows / Doors

  • Framing of Exterior / Interior Walls

  • Spray Foam Insulation

  • Electrical-Plumbing-Mechanical (this depends on the municipality)

      

Sitework:

  • Grading

  • Utilities

  • Foundation

  • Hardscape and Landscape

Step 3.

Delivery / Installation

Delivery:

  • Flat-Bed / Step-Deck Trucks from Factory to Site 

​

Installation:​

  • Craned into Property
  • Installed onto Foundation
  • Welded/Bolted Together 

  • Utilities are Connected

Step 4.

On - Site Finishes

kitchen and living.jpg

Finishing Touches:​

This is where each project is personalized to reflect the client's individual taste and preferences.

Exterior Finishes:

  • Siding

  • Roofing

  • Solar Panels

  • Exterior Lighting

​

Interior Finishes:

All that was not done in factory:​

  • Drywall / Paint

  • Flooring

  • Lighting

  • Bathroom / Kitchen Installation