Step 1.

Pre-Construction

Getting to Know You:

 

We meet our clients at our design office or over the phone. Together we  explore your needs and possibilities and answer questions regarding our property, project and our process. 

MEPs and Elevations V3.jpg

Design Phase:

 

  • Site and Feasibility Analysis

  • Site Conditions

  • Schematic Design

  • Construction Drawings

  • Structural Engineering Plans

  • Cost Estimation

  • Project Coordination

  • Permitting

Step 2.

Manufacturing / Site Prep

AdobeStock_180177203.jpeg

Beginning the construction phase:

Factory construction offers many opportunities for increased efficiency and economies of scale. The production process which is optimized in a centralized and controlled environment, allows for speed of construction and decreased waste.

Speed of construction is also achieved due to site work being done concurrently to manufacturing.

In Factory:

Depending on state, local codes, and client preferences we are able to provide a 50-90% factory built home

 

60% includes:

  • Cuts / Openings 

  • Structural Reinforcements

  • Windows / Doors

  • Framing of Exterior / Interior Walls

  • Spray Foam Insulation

  • Electrical-Plumbing-Mechanical (this depends on the municipality)

      

 Sitework:

  • Grading 

  • Utilities

  • Foundation

  • Hardscape and Landscape

Step 3.

Step 4.

Delivery / Installation

Delivery:

  • Flat-Bed / Step-Deck Trucks from Factory to Site 

Installation:

  • Craned into Property
  • Installed onto Foundation
  • Welded/Bolted Together 

  • Utilities are Connected

On - Site Finishes

kitchen and living.jpg

Finishing Touches:

This is where each project is personalized to reflect the client's individual taste and preferences.

Exterior Finishes:

  • Siding

  • Roofing

  • Solar Panels

  • Exterior Lighting

Interior Finishes:

All that was not done in factory:

  • Drywall / Paint

  • Flooring

  • Lighting

  • Bathroom / Kitchen Installation